There are numerous measurement systems available for measuring groundwaterlevels (head / stage). What period of time should measurements be collected in order to draw solid conclusions about the average groundwaterlevel, min/ max, trends, etc?

I would recon at least one year to take account for seasonal effects, although longer would be preferable.

Long measurement periods (several years) are often unwanted, due to the need for fast results. So the optimum between research duration and solid conclusions lies somewhere in between I presume.